<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>MESCATOR — Blog</title><description>MESCATOR is a sovereign, AI-native operating system for European manufacturers: works orders, machine data, traceability and realistic promise dates in one place.</description><link>https://mescator.com</link><language>en</language><item><title>One missing screw stops the line: materials and promise dates</title><link>https://mescator.com/blog/one-missing-screw-stops-the-line</link><guid isPermaLink="true">https://mescator.com/blog/one-missing-screw-stops-the-line</guid><description>A promise date assumes the material will be there. The cheapest component on the bill stops the most expensive order, and the shortage is found on the day it is needed.</description><pubDate>Thu, 22 Oct 2026 00:00:00 GMT</pubDate><category>materials</category><category>shortages</category><category>purchasing</category><category>promise dates</category><category>early warning</category></item><item><title>The changeover the plan cannot see</title><link>https://mescator.com/blog/the-changeover-the-plan-cannot-see</link><guid isPermaLink="true">https://mescator.com/blog/the-changeover-the-plan-cannot-see</guid><description>The plan sequences orders as if every changeover cost the same. On the floor it depends on what ran before, who is on and which tooling is free. Dates slip, nobody is wrong.</description><pubDate>Tue, 20 Oct 2026 00:00:00 GMT</pubDate><category>changeovers</category><category>sequencing</category><category>scheduling</category><category>machine data</category><category>promise dates</category></item><item><title>Android XR on the floor: read access, never control</title><link>https://mescator.com/blog/android-xr-on-the-floor-read-not-control</link><guid isPermaLink="true">https://mescator.com/blog/android-xr-on-the-floor-read-not-control</guid><description>Android XR makes glasses an endpoint for an AI agent. What runs on the device, what in the vendor&apos;s cloud, what in the plant&apos;s own systems, and what it may do.</description><pubDate>Tue, 13 Oct 2026 00:00:00 GMT</pubDate><category>Android XR</category><category>AI agents</category><category>OT/IT</category><category>data sovereignty</category></item><item><title>XREAL Aura on the shop floor: a screen, not a controller</title><link>https://mescator.com/blog/xreal-aura-on-the-shop-floor</link><guid isPermaLink="true">https://mescator.com/blog/xreal-aura-on-the-shop-floor</guid><description>Display glasses with an AI agent now have a price. What they could do at a workstation, what a cable and a puck mean on a factory floor, and why Europe waits.</description><pubDate>Tue, 13 Oct 2026 00:00:00 GMT</pubDate><category>XR glasses</category><category>AI agents</category><category>work instructions</category><category>traceability</category></item><item><title>Product data is cheapest on the day the product is made</title><link>https://mescator.com/blog/product-data-is-cheapest-on-the-day-the-product-is-made</link><guid isPermaLink="true">https://mescator.com/blog/product-data-is-cheapest-on-the-day-the-product-is-made</guid><description>European product rules are moving toward structured product data. Captured during production it is cheap; reconstructed from scattered records months later, it is not.</description><pubDate>Wed, 07 Oct 2026 00:00:00 GMT</pubDate><category>digital product passport</category><category>ESPR</category><category>product data</category><category>traceability</category></item><item><title>The system should prepare the decision, not make it</title><link>https://mescator.com/blog/the-system-should-prepare-the-decision-not-make-it</link><guid isPermaLink="true">https://mescator.com/blog/the-system-should-prepare-the-decision-not-make-it</guid><description>AI can draft a new schedule in seconds. Whether anybody acts on it depends on whether the reasoning is visible, and on who answers for the result when it goes wrong.</description><pubDate>Wed, 30 Sep 2026 00:00:00 GMT</pubDate><category>AI</category><category>scheduling</category><category>human in the loop</category><category>decisions</category></item><item><title>The shift should not stop when the connection does</title><link>https://mescator.com/blog/the-shift-should-not-stop-when-the-connection-does</link><guid isPermaLink="true">https://mescator.com/blog/the-shift-should-not-stop-when-the-connection-does</guid><description>In an office, a cloud outage costs a morning. On a line it costs production. That makes running on site a practical requirement in a factory, not a matter of principle.</description><pubDate>Wed, 23 Sep 2026 00:00:00 GMT</pubDate><category>sovereignty</category><category>offline operation</category><category>on-premises</category><category>continuity</category></item><item><title>The cost of quality is filed under overhead</title><link>https://mescator.com/blog/the-cost-of-quality-is-filed-under-overhead</link><guid isPermaLink="true">https://mescator.com/blog/the-cost-of-quality-is-filed-under-overhead</guid><description>Rework, holds and deviations are recorded in a binder, not against the order that caused them, so the job that loses money looks fine and everything else pays for it.</description><pubDate>Wed, 16 Sep 2026 00:00:00 GMT</pubDate><category>cost of quality</category><category>nonconformance</category><category>rework</category><category>costing</category></item><item><title>The spreadsheet that actually runs the plant</title><link>https://mescator.com/blog/the-spreadsheet-that-actually-runs-the-plant</link><guid isPermaLink="true">https://mescator.com/blog/the-spreadsheet-that-actually-runs-the-plant</guid><description>Between the ERP and the floor sits a file only one planner fully understands. It is the real scheduling system, and it is one laptop away from a very bad week.</description><pubDate>Wed, 09 Sep 2026 00:00:00 GMT</pubDate><category>scheduling</category><category>spreadsheets</category><category>planner</category><category>ERP</category></item><item><title>The system says it is finished. The floor says otherwise</title><link>https://mescator.com/blog/two-versions-of-the-truth</link><guid isPermaLink="true">https://mescator.com/blog/two-versions-of-the-truth</guid><description>Every plant runs two records of the same production, both maintained honestly, and reconciles them once a month. That delay is where the variance comes from.</description><pubDate>Wed, 02 Sep 2026 00:00:00 GMT</pubDate><category>ERP</category><category>shop floor</category><category>data latency</category><category>variance</category></item><item><title>Your machines have been talking for years</title><link>https://mescator.com/blog/your-machines-have-been-talking-for-years</link><guid isPermaLink="true">https://mescator.com/blog/your-machines-have-been-talking-for-years</guid><description>Most plants are already instrumented. The data goes to maintenance and stops there, so the plant is well measured for engineering and blind for planning.</description><pubDate>Wed, 19 Aug 2026 00:00:00 GMT</pubDate><category>OPC UA</category><category>SCADA</category><category>machine data</category><category>OT/IT</category></item><item><title>Traceability for an audit is not traceability for a recall</title><link>https://mescator.com/blog/traceability-for-an-audit-is-not-traceability-for-a-recall</link><guid isPermaLink="true">https://mescator.com/blog/traceability-for-an-audit-is-not-traceability-for-a-recall</guid><description>Most plants can produce the records an auditor asks for. Far fewer can answer which shipped units contain a suspect batch, before the second phone call arrives.</description><pubDate>Wed, 05 Aug 2026 00:00:00 GMT</pubDate><category>traceability</category><category>genealogy</category><category>recall</category><category>batch</category></item><item><title>A promise date from standard times is a guess with a decimal point</title><link>https://mescator.com/blog/a-promise-date-from-standard-times</link><guid isPermaLink="true">https://mescator.com/blog/a-promise-date-from-standard-times</guid><description>Standard times describe an operation running well with nothing going wrong. Schedules built on them are optimistic by a factor nobody measures and everybody absorbs.</description><pubDate>Wed, 22 Jul 2026 00:00:00 GMT</pubDate><category>scheduling</category><category>throughput</category><category>promise dates</category><category>capacity</category></item><item><title>Nothing we build touches the control path</title><link>https://mescator.com/blog/nothing-we-build-touches-the-control-path</link><guid isPermaLink="true">https://mescator.com/blog/nothing-we-build-touches-the-control-path</guid><description>Reading from a machine is an integration problem. Writing to one is a safety problem, and they should never be presented as two settings of the same feature.</description><pubDate>Wed, 08 Jul 2026 00:00:00 GMT</pubDate><category>functional safety</category><category>OT</category><category>boundaries</category><category>machinery</category></item></channel></rss>